Sub · Framing · Wave 1

Framing Takeoff & Estimate, Piece by Piece

Framing is a high-volume trade: hundreds of pieces — studs, plates, joists, rafters, trusses — and every one you miss on the takeoff comes straight out of your pocket when you buy the lumber. Construix measures your framing piece by piece from the plans and delivers the complete estimate: priced material with source, labor at YOUR crew's hourly rate, and a schedule showing how many weeks of work the job requires.

What we quantify on a framing takeoff

  • ✓Walls: studs by spacing (16"/24" O.C.), top and bottom plates, headers, king/jack studs, blocking;
  • ✓Floors: joists, rim joists, subfloor/floor sheathing, main beams (beams/LVL);
  • ✓Roof: rafters or trusses, ridge, roof sheathing, fascia, strapping and blocking;
  • ✓Enclosure: wall sheathing (per the specified system — e.g., panels with integrated WRB), house wrap when in scope;
  • ✓Fastening & connectors: hangers, hurricane clips, hold-downs and project-specified hardware;
  • ✓Waste applied by piece type — never a single blanket guess on the total.

What kind of job this fits

Full new-construction homes · additions · garages · multifamily · structural reinforcement/repair on remodels. If your contract is labor-only, the takeoff still gives you a real cost per SF — and backs up your number in front of the GC.

What you get

The Construix Package: summarized scope · line-item estimate with quantities by piece and dimension (2x4x8, 2x6x10 — the way you'd quote it at the lumber yard) · labor plan with hours, crew size and days per phase · an open materials list with unit price and source — ready to quote with 2-3 suppliers.

Turnaround & Pricing

On the monthly plan: included — uses 1 credit. Pay-per-project — Single Trade: $250 · 12 business hours from full intake. Framing as part of a complete project (whole house): see Residential.

Frequently Asked Questions

Do you calculate by piece or by board feet?
By piece and dimension, the way suppliers quote it — with consolidated totals.
Metal framing too?
Metal framing falls under drywall/commercial scope — describe the job when you submit and we'll confirm it during intake.
Can I use the takeoff to negotiate with the GC?
Absolutely — a documented quantity is leverage: when the GC pushes back, you can show exactly where the number came from.