For Subcontractors / Deck
Sub · Deck · Wave 1
Deck Estimate: From Footings to Railing, Piece by Piece
Decks are the perfect job to get wrong on paper: they look small, but they stack structure, decking, railing, stairs and hardware — and the material choice (pressure-treated lumber vs. composite) swings the whole number. Construix prices your deck piece by piece from the plans or from on-site measurements (for decks, we need dimensions — width, depth, height and the stair layout), with labor at your crew's hourly rate.
What we quantify on a deck takeoff
- ✓Foundation: footings/sonotubes, post bases, quantity and depth per the plans and local frost line;
- ✓Structure: posts, beams, joists with spacing, rim joists, ledger and ledger flashing;
- ✓Hardware: joist hangers, hurricane ties, structural screws, decking fasteners (face-screwed or hidden clip);
- ✓Decking: pressure-treated lumber, cedar or composite — with waste applied for the installation pattern (straight, diagonal, picture frame);
- ✓Railing: posts, balusters or cable, handrail — in the specified material;
- ✓Stairs: stringers, treads and risers by unit;
- ✓Finish items: fascia, skirting, lighting when in scope.
What you get
The Construix Package: summarized scope · line-item estimate · labor plan with hours and days · a materials list with prices and sources — basically your lumber yard shopping list, ready to go.
Turnaround & Pricing
On the monthly plan: included — uses 1 credit. Pay-per-project — Single Trade: $250 · 12 business hours from full intake (dimensions + material choice + your answers).
Frequently Asked Questions
What do you need to estimate without a drawing?
The dimensions (width × depth × height), the stair layout, the decking/railing material and photos of the site. Decks and siding require real measurements — you can't guess what has to hold people up.
Composite vs. wood: can you compare?
We can price the same deck in both materials — two versions of the estimate for you to present to your client. Let us know when you submit.
Deck inside a bigger project?
If it's part of a new home or addition, it falls under the Full Project package; standalone, it's a Single Trade estimate.