For Subcontractors / Concrete / Foundation
Sub · Concrete / Foundation · Wave 2

Concrete & Foundation Estimate: Cubic Yards, No Guesswork

Concrete is the trade where a quantity mistake hurts the fastest: one truck short and the pour stops; one truck extra hardens on the ground. The Construix concrete/foundation estimate quantifies volumes in cubic yards (CY) — footings, foundation walls, slabs, grade beams — plus everything the number depends on: formwork by contact area, rebar by size per the structural drawings, vapor barrier, joints, curing, pumping and access when called for, and flatwork (sidewalks, driveways, patios). Excavation and site prep are included when in scope.

What you get

The Construix Package — summarized scope, line-item estimate, labor plan, materials list with prices and sources (ready to quote ready-mix concrete and rebar).

Turnaround & Pricing

On the monthly plan: included — uses 1 credit. Pay-per-project — Single Trade $250 · 12 business hours from full intake.

Frequently Asked Questions

Is pumping included?
When the plans or you call for it — placement and access are items in the estimate, not a surprise on pour day.
Rebar piece by piece?
Per the structural detailing; without a structural set, we document assumptions.
Foundation for an addition?
Yes — tying into the existing foundation is its own line item.