GC · Residential · Wave 1

New home estimate: the whole house on paper

New construction is the toughest estimate in the business: every division of the job is in play — sitework, foundation, framing, roofing, MEP, finishes — and a miss in any one of them turns into lost margin or a lost bid. Construix's residential estimate covers the full project, broken out by division, with material, labor and sub-trade costs kept separate, so you can bid with the number in hand.

What's included in a new home estimate

We cover the full build, division by division: general requirements (permits, supervision, jobsite facilities) · sitework and excavation · foundation and slab · framing and sheathing · roofing · exterior finishes (siding, trim, gutters) · exterior windows and doors · plumbing · electrical · HVAC and ventilation · insulation and air sealing · drywall/wall finishes · interior finishes (doors, trim, flooring) · kitchen & bath · final finishes and cleanup — plus a miscellaneous line for the uncertainty every job carries.

Scope your own crews self-perform is priced at your labor rate; scope going to subs is priced at local market rate for the project area.

What you get

The full Construix Package as a PDF: scope summary · cost summary by division with $/SF · line-item breakdown (ready to walk through with the owner) · ABC cost curve (where the money lives) · labor plan with hours, crew size and implied duration · detailed estimate with takeoff and waste per line item · open material list with quantities, unit prices and source — ready to quote with your supplier. See a real sample in {exemplos}.

Turnaround and pricing

On a monthly plan: included — uses 1 credit. One-off — Full Project: $450 · delivered in up to 18 business hours, counted from a complete intake (plans + scope + your answers). No final plans yet? Photos + scope + measurements are enough to get started.

FAQ

Do you estimate to my finish level?
Yes — intake asks about your finish level (and any selections already made); where nothing's decided yet, we use written allowances.
What if the plans change after the estimate is delivered?
The first revision is free, and adjustments from the joint validation call are included. Changes beyond that are priced separately — with full visibility into what's new scope.
Can I use this for a bank/lender package?
The PDF is organized by division with a full bid build-up (direct cost → overhead → margin → final price) — a format lenders recognize.
Does an addition fall under this?
We estimate additions as a Full Project — tying into the existing structure is scoped as its own line item.

A whole-house bid shouldn't depend on one more late night at the takeoff.

Send the plans and get everything back in up to 18 business hours.