Remodels are the trickiest estimate in construction: the closed-up wall hides old wiring, the leveled floor hides rotten subfloor, and the client always remembers "just one more thing" mid-job. That's exactly why Construix's renovation & remodeling estimate ships with **written scope and assumptions** — when a surprise shows up (and it will), you've got a documented basis for a change order instead of eating the cost quietly.

Remodel types we estimate

  • ✓Kitchen remodel — from a full gut renovation to a finish swap, with written allowances for cabinets, countertops and appliances;
  • ✓Bathroom remodel — including waterproofing, tile, and the plumbing scope;
  • ✓Basement finish — turning the basement into livable space: framing, insulation, drywall, flooring, egress;
  • ✓Three-season rooms and attached additions ;
  • ✓Full remodel — the whole house, estimated by division as a Full Project.

How we handle what the plans don't show

In a remodel, half the estimate is assumption. Our method: everything we assumed (existing structure condition, what stays, what gets demoed) gets written into the scope summary; anything that depends on opening a wall becomes a documented assumption or allowance. During the joint validation call, you — the one who knows the house — sign off on the assumptions before the final version. Written scope is what separates a profitable remodel from one that quietly ate its margin.

What you get

The full Construix Package (scope summary · cost summary with $/SF · line-item breakdown · ABC cost curve · labor plan · detailed estimate + takeoff · material list with sources) — with the line-item breakdown pulling double duty: your cost control and a clear conversation with the homeowner.

Turnaround and pricing

On a monthly plan: included — uses 1 credit. One-off — Remodel: $350 · up to 18 business hours (single room or a set of rooms); full remodel: $450 (Full Project). Timeline starts once intake is complete.

FAQ

I don't have plans for the house — now what?
The classic remodel scenario, and an easy fix: photos from every angle + measurements + a written description of the scope. We confirm material and clear up questions before we run the number.
The client changed their mind mid-project — does the estimate keep up?
The first revision is free. Changes beyond that are priced separately, with full clarity on what changed — that's exactly why the original scope stays documented.
Do you estimate just my portion (say, just the kitchen) on a bigger project?
Yes — you define the scope boundary.

A good remodel starts with a written assumption.

Send photos and scope, get the estimate back in up to 18 business hours.