Serviços / Guide
Guide

How estimating pricing works (and what it actually costs)

"How much does an estimate cost?" is the first question anyone considering outsourcing asks — and the market answers it in so many different ways that comparing quotes becomes its own project. This guide lays out the pricing models, shows where each one hides cost, and explains how Construix prices its work.

The three pricing models in the market

Hourly: you only find out the total cost at the end — complex projects turn into an unpredictable invoice. Percentage of the job's value: it lines up the wrong incentive — the bigger the number, the bigger the bill for whoever produced it. Flat fee per project: the cost is known before you submit; the risk of variance sits with the estimator, not you. It's the model we consider fairest to the contractor, and it's ours.

What makes the price change

Four factors drive price under any model: project size, number of trades involved, the quality of the documentation (complete plans price faster than photos and a description), and turnaround time. That's why serious flat pricing is priced by project TYPE — not a single magic number.

Construix's pricing

Published table: Single Trade $250 · Remodel $350 · Full Project $450, with turnarounds of 12 to 24 business hours. Multifamily, commercial, and atypical sizes: quoted separately, with a response within 60 minutes. And monthly plans ($750 to $2,000) drop the cost per estimate for contractors bidding every week — on Dominate, it's as low as $100. It's all on the Pricing page.

The return on investment

The estimate pays for itself two ways. On the job you win: a bid delivered on time, with a defensible number, closes more work. On the loss avoided: a single missed item on a remodel usually costs more than a year of estimates. The full comparison against the cost of an in-house estimator is in our outsourcing vs. in-house guide.

Frequently asked questions

Why not charge hourly?
Because you deserve to know the cost before you decide — any variance is on us, not on your invoice.
Are there hidden costs?
No: 1 free revision per estimate, joint validation always included, and a scope change is the only thing that generates a new cost — always agreed on beforehand.

Price on the table before any commitment.

Check out the full pricing table or send us a project now.