Glossary

The Brazilian contractor's glossary for the US market

US construction has its own vocabulary — and knowing it is worth real money: it's what shows up in the contract, the bid, and the conversation with the GC. This glossary breaks down, in plain terms, the words you'll run into most.

Core terms

Estimate
The project budget: quantities plus material and labor costs. Not to be confused with a takeoff (quantities only) or a bid (the submitted proposal).
Takeoff
A quantity survey pulled from the plans, with no pricing attached.
Quantity Takeoff
A takeoff covering every quantity on the job (materials, areas, counts). Used interchangeably with "takeoff."
Material Takeoff
A takeoff focused on the purchase list of materials. A subset of the quantity takeoff.
Labor Estimate
The labor projection (hours and labor cost).
Bid
The proposal submitted for a competitive job. Not the same as an estimate (the number) or a proposal (the sales document for the end client).
Proposal
A formal sales document (usually for the end client/homeowner). Bid = for competition; proposal = sales document.
Scope of Work (SOW)
What's included and excluded in the work. Not to be confused with specs.
Change Order
A formal contract amendment to scope, price, or schedule. Not the same as T&M (time and materials work).
Addendum / Addenda
Document(s) issued during bidding that change the project. Not the same as a change order (which happens post-contract). Addenda = plural.
Plans
The project drawings. Used interchangeably with "drawings."
Drawings
The technical sheets of the project. Used interchangeably with "plans."
Specifications (specs)
Written technical specs (materials, standards, methods). Not to be confused with schedules.
General Contractor (GC)
The party responsible for the entire project in front of the client.
Subcontractor (sub)
The party that performs one trade for the GC.
Trade
A construction specialty (framing, drywall, painting...).

Process and document terms

ITB (Invitation to Bid)
The GC's invitation to price the job, with documents and a deadline.
Schedules
Door/window/finish tables included in the plans.
ROM (Rough Order of Magnitude)
A ballpark figure — an early-stage estimate.
Preliminary / Budget Estimate
A reference estimate built on partial plans.
Waste
Material loss added on top of the net quantity.
Markup / Marked-up plans
Plans marked up to show what was measured.
Overhead & Profit (O&P)
The company's fixed costs plus profit.
General Conditions
Job-wide costs (supervision, portable toilet, cleanup...).
Contingency
A reserve set aside for unforeseen items.
CSI MasterFormat
The US system for organizing scope by divisions.
Prevailing wage / Davis-Bacon
The minimum wage required on public works projects.
T&M (Time & Materials)
Billing based on hours plus materials.
NDA
Non-disclosure agreement.
SF / LF / SY / CY
Units: square feet / linear feet / square yards / cubic yards.
Square (roofing)
100 SF of roof coverage.
Pitch
Roof slope.
Win rate
The percentage of bids won.
Bid leveling
The GC's comparison of sub proposals.
Follow-up
Checking in after a bid is submitted.
Lead
A business opportunity or sales contact.
Jobsite / job
The construction site / the contracted work.

Trade terms

Framing
The wood (or metal) structural skeleton of the building.
Stud / plate / header / blocking
Vertical framing member / horizontal top or bottom member / beam over an opening / hidden reinforcement.
Joist / rafter / truss / sheathing
Floor beam / roof rafter / roof truss / structural panel covering.
Lumber
Construction-grade wood.
Drywall (hang / finish / levels)
Gypsum board; installation / finishing / finish levels 0-5.
Trim
Wood finish work (baseboards, casing).
Underlayment
Base layer under roofing or flooring.
Flashing / valley / ridge
Metal water diverter / roof valley / roof ridge.
Ice & water shield
Membrane protecting against ice-related water intrusion.
Tear-off
Removal of the old roof.
Footing / slab / grade beam / formwork / rebar
Foundation footing / concrete slab / grade beam / concrete forms / reinforcing steel.
Vapor barrier
Vapor barrier placed under the slab.
Flatwork
Flat concrete work (sidewalks, driveways, patios).
Subfloor
The base layer under finish flooring.
LVP/LVT · hardwood · tile
Luxury vinyl plank/tile · hardwood · ceramic/porcelain tile.
Thinset / grout
Tile-setting mortar / grout.
Basement
A below-grade level, common in US construction.
Addition
An expansion of an existing structure.
Remodel
A renovation.
Build-out / TI (tenant improvement)
Fit-out of commercial space for the tenant.

Found a term that's not here?

Send it our way — this glossary grows with the real questions contractors ask.

Suggest a term