Estimates

How to Prepare and Send Your Plans for an Estimate

What to send, in what format, and what to include to get a fast, accurate estimate — even when you don't have complete plans.

ConstruixSep 2, 20264 min read
Share:
Yellow hard hat, red pencil and calculator on architectural plans, a plan set ready to send for estimating

The speed and accuracy of an estimate start before the estimator ever opens the first file: they start with the package you send. A complete, organized set of documents means a faster proposal, a more accurate number, and fewer back-and-forth questions. This guide shows exactly what to prepare — including for the cases where the complete plans simply don't exist.

The ideal package (when the project is fully designed)

1. The complete set of plans, in the most recent revision.
Every sheet — architectural, structural, and MEP where applicable — not just the floor plan. Sections, elevations, and details carry information that changes the number: ceiling height, finishes, construction details. Send the full set and let the estimator decide what's not needed, not the other way around.

2. The specs, if they exist.
On commercial jobs, the specs carry as much weight as the drawing: they define materials, standards, and methods. Without them, the estimate has to assume things — and too many assumptions is a risk for both sides.

3. The addenda, if it's a bid.
If the GC issued addenda during bidding, they're part of the project. Send all of them, in order.

4. The scope you want priced.
Tell the estimator what to include: the full project or specific trades? Anything you already know is out of scope (client-supplied material, for example)? Two sentences here save days of back-and-forth.

5. The project location.
City and state, at minimum — material and labor costs change by region, and a good estimate prices where the job actually is.

6. Your bid deadline.
Have a date? Say so right away, so the production schedule can be built backward from your deadline.

7. Your field notes.
What the drawing doesn't show but you already know: an occupied site, difficult access, restricted hours, client requirements. Real conditions become written assumptions — and written assumptions protect your price.

File formats: what works

PDF is the industry standard — it's how plans circulate in the US, and it works perfectly for digital takeoff. Prefer a PDF exported straight from the project (sharp, with scale intact) over photos of a printed sheet. If you do scan it, scan it straight, complete, and legible.

Construix accepts nearly any format: PDF, DWG/DXF from CAD, images (JPG, PNG, TIFF), spreadsheets, and photos with a written description. The only exception is video. When in doubt, send the file as-is — any compatibility issue gets sorted out during intake.

File too large for the form? Use a Dropbox, Google Drive, or WeTransfer link in the field provided.

What if there are no complete plans?

A common scenario — especially in remodels and exterior trades — and one that doesn't stop the estimate from happening. The path here is a preliminary estimate, built on documented assumptions. The more of the following you can send, the better the number:

  • Photos of the space or house, from multiple angles

  • Field measurements — even a hand-drawn sketch with dimensions raises the accuracy significantly

  • A clear scope description: what will be done, and to what finish standard

  • Old plans, if the house has any (even outdated ones help with the geometry)

  • For roofing: just the property address is enough — Construix measures by satellite, no plans needed

As the project develops, the preliminary estimate develops with it — no starting over from scratch.

Submission checklist (copy and use)

  1. Complete plans, most recent revision

  2. Specs and addenda (if any)

  3. Scope: what to price and what to exclude

  4. Project city/state

  5. Bid date

  6. Field notes

  7. Your contact information

Frequently asked questions

I only sent the floor plan. Is that enough?
It's enough to start the conversation — but the number built from the full set is a different number. If sections and elevations exist, send them.

My files are confidential. How are they protected?
At Construix, your documents are used exclusively to produce your proposal and your estimate — and confidentiality is contractual: an NDA clause in the monthly agreement and in every one-off estimate acceptance. Your client's information gets the same protection.

Can I just send everything over WhatsApp?
The Request an Estimate form is the fastest channel — it organizes everything at once and triggers intake immediately. For monthly plan clients, the submission format is set up with your operation at the start of the contract.

How long after sending do I get a response?
For one-off requests, pricing arrives within 60 minutes of submission. The estimate timeline starts from complete intake: 12 business hours (single trade), 18 hours (full residential), 24 hours (multifamily/commercial).

Tags:#processo
Construix Estimating Department

Need an accurate estimate for your next project?

Send us your plans or job scope. Our team of experienced engineers delivers complete takeoffs with labor and material costs in 12–24 hours.

CX

Construix

Construix Engineering & Estimating Team: supporting General Contractors and Subcontractors across the US with accurate bids and takeoff estimates.

Get new estimating guides in your inbox
— practical strategies to win more construction bids.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.